• Login
    View Item 
    •   Home
    • University of Alaska Anchorage
    • Graduate School
    • Student Projects for Graduate Degrees
    • View Item
    •   Home
    • University of Alaska Anchorage
    • Graduate School
    • Student Projects for Graduate Degrees
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Scholarworks@UACommunitiesPublication DateAuthorsTitlesSubjectsTypeThis CollectionPublication DateAuthorsTitlesSubjectsType

    My Account

    Login

    First Time Submitters, Register Here

    Register

    Statistics

    Display statistics

    Construction productivity and cost reporting

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Champion Robert PM-686B - Final ...
    Size:
    1.102Mb
    Format:
    PDF
    Download
    Author
    Champion, Robert Steven
    Keyword
    construction productivity reporting
    labor unit rate
    measuring labor productivity
    construction cost estimate
    productivity variance
    construction cost reporting
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/11122/10044
    Abstract
    This research report improves the likelihood of meeting construction project and business objectives by implementing self-perform labor productivity and cost reporting process. The overall approach includes a literature review of construction productivity reporting, evaluating existing reporting processes of an operating construction company, evaluating reporting process improvements on a model project, interviewing subject matter experts in cost control, and evaluating model project survey responses. The research approach involves evaluating a construction organization’s existing processes for estimating in standard units of measure, reviewing existing procedures for establishing cost control budgets, researching methods for developing a process for tracking installed material quantities, researching methods for preparing weekly productivity reports, and labor unit rate benchmarking. Additionally, this report includes examining methods for reducing operational rework for projects executed in the construction industry by implementing a proactive corrective action based on verified actual cost and productivity rates. The results of this research demonstrate that utilizing project management methodology as an approach to researching construction cost and productivity reports improves the success of implementing company standardized reporting processes and provides an opportunity to meet business objectives.
    Table of Contents
    Table of Contents / Lists of Exhibits / Acknowledgements / Abstract / Introduction / Literature Review / Model Project / Model Project Team Member Survey / Subject Matter Expert Interviews / Conclusions & Recommendations / References / Signature Page Appendix
    Date
    2018-12-01
    Publisher
    University of Alaska Anchorage
    Type
    Report
    Collections
    Student Projects for Graduate Degrees

    entitlement

     
    ABOUT US|HELP|BROWSE|ADVANCED SEARCH

    The University of Alaska Fairbanks is an affirmative action/equal opportunity employer and educational institution and is a part of the University of Alaska system.

    ©UAF 2013 - 2023 | Questions? ua-scholarworks@alaska.edu | Last modified: September 25, 2019

    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.