• Login
    View Item 
    •   Home
    • University of Alaska Fairbanks
    • College of Engineering and Mines (CEM)
    • Institute of Northern Engineering
    • INE Research Publications
    • INE Project Reports
    • View Item
    •   Home
    • University of Alaska Fairbanks
    • College of Engineering and Mines (CEM)
    • Institute of Northern Engineering
    • INE Research Publications
    • INE Project Reports
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Scholarworks@UACommunitiesPublication DateAuthorsTitlesSubjectsTypeThis CollectionPublication DateAuthorsTitlesSubjectsType

    My Account

    Login

    First Time Submitters, Register Here

    Register

    Statistics

    Display statistics

    Phase II: Chulitna River Bridge Structurally Health Monitoring

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    2014-04_Phase II_Chulitna River ...
    Size:
    5.120Mb
    Format:
    PDF
    Download
    Author
    Hulsey, J. Leroy
    Xiao, Feng
    Dolan, J. Daniel
    Keyword
    Instrumentation (Esxj)
    Sensors (Dmgu)
    Testing (G)
    Finite Element Method (Gej)
    Load factor (Rkmyim)
    Structural health monitoring (Grs)
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/11122/10375
    Abstract
    This study is phase 2 of a two phase research project. In Phase 1 a structural health monitoring system (SHMS) was installed on the Chulitna River Bridge. This bridge is 790 feet long, 42 foot 2 inches wide and has 5 spans. As part of that effort, three loaded dump trucks were used to conduct seventeen static and dynamic loadings on the structure. In addition to studying the bridge using SHMS, two ambient free vibration tests were conducted a year apart by. In 1993, the deck on this 1970 five span bridge was widened from 34-feet to a 42 foot 2 inch concrete deck. Increased load was accounted for by strengthening two variable depth exterior girders and converting interior stringers to interior truss girders. Construction documents for the upgrade called for stage construction. At the time of this study, the bridge had five bearings that were not in contact with the superstructure. Feasibility of using Structural Health Monitoring Systems (SHMS) for Alaska Highway Bridges was examined. Also, SHMS data for the load tests of Phase 1 were used to calibrate a three-dimensional model (FEM) to predict response and conduct a 2014 Operating Load Rating.
    Table of Contents
    LIST OF FIGURES ....................................................................................................................... iv LIST OF TABLES ........................................................................................................................ vii DISCLAIMER .............................................................................................................................. ix EXECUTIVE SUMMARY............................................................................................................. 1 CHAPTER 1.0 INTRODUCTION................................................................................................. 3 1.1 History .............................................................................................................................. 3 1.2 Bridge Details ................................................................................................................... 3 1.3 Phase 1 Research Study.................................................................................................... 5 1.4 Phase 2 Research Study.................................................................................................... 5 CHAPTER 2.0 LOAD RATING.................................................................................................... 7 2.1 General ............................................................................................................................. 7 2.2 Operating Load Rating ................................................................................................... 10 2.2.1 Investigation with updated calibrated finite element model, FEM (as-is condition) ............................................................................................................................. 11 2.2.2 Model 1 – Four members (A, B, C, and D) removed ............................................. 11 2.2.3 Model 2 – Five members (A, B, C, D, and E) removed ......................................... 11 2.2.4 Other alternative operating load ratings. ................................................................. 12 CHAPTER 3.0 CALIBRATED FINITE ELEMENT MODEL ................................................... 32 CHAPTER 4.0 PROPOSED ALASKA BRIDGE MONITORING SYSTEM ............................ 34 4.1 General ........................................................................................................................... 34 4.2 Selecting SHMS for Alaska ........................................................................................... 35 4.3 New Bridges (Proposed Monitoring Systems) ............................................................... 36 4.4 Existing Bridges (Proposed Monitoring Systems) ......................................................... 36 4.5 All Bridges (Proposed Monitoring Systems) ................................................................. 36 CHAPTER 5.0 CONCLUSIONS................................................................................................. 39 5.1 Phase 1 (Previous Study)................................................................................................ 39 5.1.1 Gravity load testing ................................................................................................. 39 5.1.2 Ambient testing (2012 tests were Phase 1; 2013 tests were Phase 2) ..................... 40 5.2 Phase 2 (Current Study) ................................................................................................. 40 5.2.1 Outcome 1 – Finite element model ......................................................................... 41 5.2.2 Outcome 2 – Structural evaluation and load rating ................................................ 41 5.2.3 Outcome 3 – LRFR HL-93 live load stresses for the critical members .................. 41 APPENDIX A – SIMPLE ACCURACY TEST............................................................................ 44 APPENDIX B – LONGITUDINAL BEHAVIOR TEST ............................................................. 47 APPENDIX C – MODEL IMPROVEMENTS (LONGITUDINAL DIRECTION) .................... 50 APPENDIX D – TRANSVERSE BEHAVIOR PRIOR TO MODEL MODIFICATIONS.......... 52 APPENDIX E – MODEL IMPROVEMENTS (TRANSVERSE DIRECTION)......................... 57 APPENDIX F – CORRELATION BETWEEN CALIBRATED MODEL AND EXPERIMENTAL DATA............................................................................................................. 61 APPENDIX G – CALIBRATED FINITE ELEMENT MODEL ................................................. 63 APPENDIX H – SENSOR LAYOUT .......................................................................................... 66 APPENDIX I – LOAD TESTING................................................................................................ 69 APPENDIX J – A FUTURISTIC APPROACH TO CALIBRATING A FINITE ELEMENT MODEL ........................................................................................................................................ 83
    Date
    2015-01
    Type
    Technical Report
    Collections
    INE Project Reports

    entitlement

     
    ABOUT US|HELP|BROWSE|ADVANCED SEARCH

    The University of Alaska is an affirmative action/equal opportunity employer, educational institution and provider and prohibits illegal discrimination against any individual.

    Learn more about UA’s notice of nondiscrimination.

    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.