• Login
    View Item 
    •   Home
    • University of Alaska Anchorage
    • Institute of Social and Economic Research (ISER)
    • Publications
    • Reports
    • View Item
    •   Home
    • University of Alaska Anchorage
    • Institute of Social and Economic Research (ISER)
    • Publications
    • Reports
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Scholarworks@UACommunitiesPublication DateAuthorsTitlesSubjectsTypeThis CollectionPublication DateAuthorsTitlesSubjectsType

    My Account

    Login

    First Time Submitters, Register Here

    Register

    Statistics

    Display statistics

    Susitna-Watana Cost of Power Analysis

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    2013_06-SusitnaCostAnalysis.pdf
    Size:
    547.7Kb
    Format:
    PDF
    Description:
    Full Report
    DownloadPDF Variant
    Thumbnail
    Name:
    2013_06-SusitnaCostAnalysis.xlsx
    Size:
    481.0Kb
    Format:
    Microsoft Excel 2007
    Description:
    Datasheet
    DownloadPDF Variant
    Author
    Colt, Steve
    Keyword
    costs
    hydropower
    energy
    power
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/11122/11992
    Abstract
    This paper provides a simple analysis of the cost of the proposed Susitna-Watana hydroelectric project from a ratepayer perspective, using data current as of June 2013. The Susitna Case 1 assumptions include a capital cost of 5.19 billion 2012 dollars, 100% debt financing at 5.0%, and an on-line date of 2024. Under these assumptions plus others described below, the production cost of Susitna power in 2024 would be 13 cents per kilowatt-hour (kWh) and the cost at a Railbelt customer’s meter would be about 18 cents per kWh.1 By comparison, if natural gas is available to electric utilities in year 2024 at a price of about $9.50 per million btu, and ignoring potential carbon taxes, then the production cost and retail cost of power from a new combined cycle gas turbine going online in 2024 would be about 11 cents and 16 cents per kWh, respectively.
    Date
    2013
    Type
    Dataset
    Report
    Collections
    Reports

    entitlement

     
    ABOUT US|HELP|BROWSE|ADVANCED SEARCH

    The University of Alaska is an affirmative action/equal opportunity employer, educational institution and provider and prohibits illegal discrimination against any individual.

    Learn more about UA’s notice of nondiscrimination.

    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.