Show simple item record

dc.contributor.authorRobson, Alena
dc.date.accessioned2015-07-07T18:43:57Z
dc.date.available2015-07-07T18:43:57Z
dc.date.issued2015-05-01
dc.identifier.urihttp://hdl.handle.net/11122/5634
dc.descriptionPresented to the Faculty of the University of Alaska Anchorage in Partial Fulfillment of the Requirements for the Degree of MASTER OF SCIENCEen_US
dc.description.abstractThe State of Alaska requires contractors to follow specific quality standards for heavy civil asphalt construction projects. Contractors face financial and scheduling risks if these standards are not addressed effectively and in conformance with necessary criteria. Contractors must complete project work to meet customer requirements and conform to quality standards efficiently and cost effectively. Doing so ensures that the State of Alaska’s quality standards are met and contractors’ financial and schedule targets can be achieved with the most efficient use of scarce resources. Currently, there is an indirect cost savings to the contractor to perform QC in a specific manner because it reduces or in some cases eliminates rework. The desired state is to directly save money by applying efficient quality control methods. This project produced a manual that describes best practices and quality control procedures that can be applied by heavy civil asphalt construction contractors to meet necessary SOA quality standards in a more timely, cost effective and efficient way. The correct application of this manual should result in a savings of 1% on the bid cost per asphalt ton.en_US
dc.description.tableofcontentsIntroduction / Research Methods / Data Analyisisen_US
dc.language.isoen_USen_US
dc.publisherUniversity of Alaska Anchorageen_US
dc.subjectState of Alaskaen_US
dc.subjectquality controlen_US
dc.subjectasphalt constructionen_US
dc.subjectasphalt contractorsen_US
dc.subjectquality standardsen_US
dc.subjectheavy civil construction projecten_US
dc.titleA Manual to Improve Efficiency in Contractor-Supplied Quality Control on Asphalt Heavy Civil Construction Pojects on State of Alaska-Owned Roadsen_US
dc.typeReporten_US
refterms.dateFOA2018-06-01T00:00:00Z


Files in this item

Thumbnail
Name:
Robson, Alena PM 686B SP 15 v2.pdf
Size:
43.95Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record