Authors

Files

Download

Download Full Text (1.4 MB)

Description

This memorandum summarizes the economic evaluation of four candidate hydroelectric projects. For each site, the evaluation procedure compares the total costs of electric power with and without hydro over a 35 year planning period extending through the year 2032. The memo is organized into four sections, one for each candidate site. An appendix provides further notes on model mechanics.

Publication Date

4-17-1997

Keywords

Chuiisax Creek, Atka, Gartina Creek, Hoonah, Old Harbor, Pyramid Creek, Unalaska, hydroelectric projects

Handle

http://hdl.handle.net/11122/12508

Rural Alaska Hydroelectric Assessment: Stage 2 Economic Evaluation of Hydroelectric Projects in Atka, Hoonah, Old Harbor, and Unalaska

Share

COinS