In continuation of a previously completed project entitled Evaluate Presawn Transverse Thermal Cracks for Asphalt Concrete Pavement, this project was a further effort to understand important variables in the thermal cracking process through continued field monitoring of three precutting test sites in Interior Alaska. The test sites included (1) Phillips Field Road, precut in 1984 (≈ west ¼ mile of this road), (2) Richardson Highway precut in 2012 (≈ MP 343–344), and (3) Parks Highway precut in 2014 (≈ MP 245–252). Preliminary results at relatively short periods (up to 4 years) indicate that precutting is an economically promising way to control natural thermal cracks. Even short-term economic benefits appear to range between about 2% and 21%. The degree to which precutting works for an AC pavement appears to be a function of the thickness and general structural robustness of new construction. Shorter precut spacing, along with stronger and/or thicker pavement structures, looks promising with respect to crack control. Continuing evaluation and monitoring of test sections are needed to recommend an effective design methodology and construction practice for Alaska and cold areas of other northern states.

Publication Date

8-17-2017

Keywords

Alaska, Asphalt concrete, Sawing, transverse cracking, Cracking

Handle

http://hdl.handle.net/11122/9587

Continued Field Evaluation of Precutting for Maintaining Asphalt Concrete Pavements with Thermal Cracking

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.