Files

Download

Download Full Text (1.9 MB)

Description

Prior research work (Goering and Kumar, 1996; and Goering, 1996) has indicated that Air Convection Embankments are a promising technique for limiting the thaw settlement damage that often occurs when roadway embankments are constructed in regions of warm permafrost. These studies lead to the proposal of a full-scale experimental Air Convection Embankment (ACE) to be constructed through the Federal Experimental Features in Construction Program. A work plan for including an ACE in the Parks/Chena Ridge Interchange project (Federal Project No. I-0A4-5(7), State of Alaska Project No. 63538) was forwarded and approved in 1994. This project report discusses the design and construction of the Parks/Chena Ridge ACE expermimental feature which occurred during 1996 and 1997.

Publication Date

12-17-1997

Handle

http://hdl.handle.net/11122/10366

Air Convection Embankment Experimental Feature Design

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.